← Admin Tools

Planning Hub

Every active plan, roadmap, and to-do for the troop portal — in one place. Click a card to see its details.

Active Roadmaps

Payments Rollout

Stripe live for leader testing. Homepage Donate CTAs shipped (admin-only). New: Dues Pay Link — a no-login /pay-dues/<token> page per Trailman, with a no-login scholarship request that lands in Contacts (built, awaiting functions + rules deploy). Remaining: expand gates to all members, ACH toggle, member announcement, the donation Checkout branch, /donate public launch.

Live (leaders only) Dues pay link: deploy pending
Updated 2026-10-23

Status Links & TLC Step

The checklist’s Trail Life Connect step now follows the nightly TLC sync (not started / add son / fee + waiver left / done). Admins can make a private no-login /status/<token> link per family and send it from their own phone or email.

Staging Functions + rules deploy pending
Built 2026-10-30

Woodsman Achievement

Knife-safety checklist on every Mountain Lion-and-older Trailman’s profile. Parent or leader checks items, one parent consents, Troopmaster / TML signs off → “May carry a knife at troop events”. Leader roster + Trailmen filter.

Staging (demo) Rules deploy pending
Built 2026-10-30

Go-Live Checklist

The canonical list of everything to flip when we take the portal fully public: the admin+leader payment gates, the homepage body.tl-admin features (Donate CTAs, Upcoming Events), Stripe live keys, test-data cleanup, the public /donate page, nonprofit pricing, ACH, the member announcement.

Not yet live
New 2026-05-12

User Flow Improvements

17 suggestions from the recent review of the signup → login → profile-completion flows. Ranked by impact.

Pending 17 items
Captured 2026-05-10

Performance & Testing

Page-load and flow-completion performance. Three fixes just shipped to cut sign-up→checklist time from ~50s to a target ≤8s. Plus a testing roadmap.

3 fixes shipped Testing pending
Captured 2026-05-11

Ledger Reports

Year-end reports for the accountant: Income/Expense by Category, Donor Summary, CSV Export, Receipts Bundle.

Reports 1–3 shipped Report 4 pending

Email Setup

Interim plan: send transactional email from a free Gmail at gracetraillife@gmail.com while Workspace is deferred. info@gracetraillife.org forwards replies into the same inbox. Code is already templated on GMAIL_USER; next step is generating an app password on the new Gmail.

⚠ In progress Code refactor done
Updated 2026-05-13 · Next: step 1 (app password on gracetraillife@gmail.com)

Media Release per Trailman

Per-child photo/video consent required at signup; surfaces as a per-trailman checklist item for kids who joined before this existed. Design proposed; deferred while we figure out the actual release wording.

Deferred Design proposed
Captured 2026-05-13 · Blocked on Q1 (release wording)

Follow-ups & Polish

Non-blocking polish identified during build sessions. Some already done, others queued.

Mixed

Quick TODOs

Small deferred items from conversations — one-line each. Stuff that's not big enough for its own roadmap.

Open
Source: project_todos.md (Claude memory)

Reference Docs

Not active plans — how-to references kept for future you.

How this hub works: Each card links to a sub-page with the full plan for that topic. These HTML pages are the single source of truth — there are no separate .md roadmap files anymore. When you complete or change an item, edit the HTML page. The admin dashboard also shows a Planning Hub widget with pinned shortcuts to the active roadmaps — its list is the PLANNING_PINS array in dashboard/dash.js; keep it in sync with the "Active Roadmaps" cards above (see PLANNING.md → "Dashboard widget").